News

20210126_143833

Litecast expands into new plant and “doubles” its production capacity

At the beginning of 2020 an initial order was placed for the supply of 4 lines of self-reacting beam formwork and five automated machines that allow Litecast, to replace many of the previous manual processes with machines to be more efficient.

As the project progressed, two more self-reacting tracks were added for a total of 6.

Read the full article

Share

Read also ...

New Speedy!

Our Speedy during the transport and casting of concrete in Portugal!…

New project in Romania

The first of two 1200ton self-reacting beam production lines with hydraulic opening and closing base with side moulds to produce bridge I beams….