Procurar
Close this search box.

New installation in France!

N°2 tilting tables with a length of 26 m and widths of 4 and 3.2 m respectively, with sanded casting surface and predisposition for concrete curing plant.

New double Speedy in Turkey!

New double Speedy for transport and distribution of concrete with hopper capacity 4 m³, commissioned and delivered in Turkey!

 ICCX North Africa

 The ICCX North Africa 2024, will take place in Casablanca, Morocco from 23 to 24 October.

Universal beam line in Morocco

A universal beam line, 100m in length, with full-length lateral sides operated manually for the production of pre-stressed beams. It offers variable width ranging from 20 to 60 cm and height up to 80 cm. The strand anchoring structure is engineered to withstand a load capacity of 600 ton

New project in Romania

The first of two 1200ton self-reacting beam production lines with hydraulic opening and closing base with side moulds to produce bridge I beams.

Mould for precast U elements

Mould for precast U elements, adjustable in height and length, and two fixed tables to produce slabs and end walls for a rainwater containment tank system in Poland.