Procurar
Close this search box.

New installation in France

The supply includes a tilting table (with lifting system that allows an easy removal of the panel from a vertical position) and 4 fixed tables for the production of prefabricated architectural concrete panels.

Battery Mould in Brazil

We consolidate our presence in Brazil with the installation of the second battery mould during the month of March! The structure consists of 10 pockets to produce precast concrete panels.