We consolidate our presence in Brazil with the installation of the second battery mould during the month of March! The structure consists of 10 pockets to produce precast concrete panels.
New installation in France
The supply includes a tilting table (with lifting system that allows an easy removal of the panel from a vertical position) and 4 fixed…