Поиск
Close this search box.

News

WhatsApp Image 2024-03-06 at 11.50.16

Battery Mould in Brazil

We consolidate our presence in Brazil with the installation of the second battery mould during the month of March! The structure consists of 10 pockets to produce precast concrete panels.

Condividi

Leggi anche ...

New installation in France!

N°2 tilting tables with a length of 26 m and widths of 4 and 3.2 m respectively, with sanded casting surface and predisposition for…

New double Speedy in Turkey!

New double Speedy for transport and distribution of concrete with hopper capacity 4 m³, commissioned and delivered in Turkey!…